ECOCUBE - Trademark Details
Status: 605 - Abandoned - After Publication
Serial Number
85456438
Word Mark
ECOCUBE
Status
605 - Abandoned - After Publication
Status Date
2013-11-02
Filing Date
2011-10-26
Mark Drawing
4000 - Standard character mark
Typeset
Published for Opposition Date
2013-10-15
Attorney Name
Law Office Assigned Location Code
L70
Employee Name
DELGIZZI, RONALD ERNES
Statements
Indication of Colors claimed
Color is not claimed as a feature of the mark.
Goods and Services
Data center and server room computer hardware, computer software for administration of computer networks and peripheral equipment, namely, uninterruptible electrical power supplies, electrical battery power supplies, electrical power distribution units, data center cooling systems, namely, climate control systems consisting of digital thermostats for cooling equipment, computer hardware for high speed processing and storage of data using multiple CPUs, mounting racks for computer hardware and enclosures for computer hard drives, computer servers, computer networking hardware, computer hardware and software for setting up and configuring local area, wide area, wireless and telecommunication networks, electric wires and cables, voltage surge protectors, computer interface boards, computer network interface devices, computer network adapters, switches, routers and hubs
Goods and Services
(Based on China Registration 10092806) Air conditioning units for computer centers, control centers, measuring rooms and server rooms; air conditioning units for electronic data processing racks and server racks, and parts and subassemblies therefor; humidifiers; dehumidifiers; electric fans; ceiling fans; air purifiers; air filters for air conditioning units
Goods and Services
(Based on China Registration 10092804) Technical consultancy and technical project planning in the field of power supply systems for electronic data processing rooms, electronic data processing racks, electronic data processing servers, and computers; technical consultancy and technical project planning in the field of the installation of power supply cables, air supply cables, supply cables for cooling mediums, data lines, connection units, and standby battery supply equipment; technical consultancy and technical project planning in the field of electronically based monitoring systems for rooms, temperatures, humidity and access control, control systems for computer centers, cooling systems for computer centers, control centers, measuring rooms and server rooms; technical consultancy and technical project planning in the field of cooling systems for electronic data processing racks, server racks, air conditioning systems, ceiling-mounted cooling installations, and humidifiers; design services for others, namely, electrical and electronic system design services and engineering design services in the fields of electrical and electronic apparatus and instruments, monitoring and control instruments, electronic computer data processing racks, computer server racks, power supply systems, power supply cables, computer data lines, standby battery power supply equipment, electronic monitoring and access control systems for rooms for monitoring room temperature, room humidity and rooms access, electronic control systems for computer centers, cooling systems for computer centers, computer control centers, measuring rooms, namely, rooms to monitor power usage and network usage and server rooms, cooling systems and cooling supply systems for electronic data processing rooms, electronic data processing racks, electronic data processing servers, computers, and server racks; design services for others, namely, engineering design services and electronic and electrical system design services in the fields of air conditioning systems, ceiling-mounted cooling installations, humidifiers, dehumidifiers, electrical fans, and climate control and conditioning apparatus
Pseudo Mark
ECO CUBE
Classification Information
International Class
011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes. - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes.
US Class Codes
013, 021, 023, 031, 034
Class Status Code
8 - Abandoned
Class Status Date
2013-11-02
Primary Code
011
International Class
042 - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software; legal services. - Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software; legal services.
US Class Codes
100, 101
Class Status Code
8 - Abandoned
Class Status Date
2013-11-02
Primary Code
042
Correspondences
Name
PETER S. SLOANE
Address
Please log in with your Justia account to see this address.
Foreign Application Information
Filing Date | Application Number | Country | Foreign Priority Claim In |
China P.Rep. | False | ||
China P.Rep. | False |
Trademark Events
Event Date | Event Description |
2011-10-29 | NEW APPLICATION ENTERED IN TRAM |
2011-10-31 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
2011-11-01 | NOTICE OF PSEUDO MARK MAILED |
2012-01-27 | ASSIGNED TO EXAMINER |
2012-02-06 | NON-FINAL ACTION WRITTEN |
2012-02-06 | NON-FINAL ACTION E-MAILED |
2012-02-06 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
2012-06-19 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
2012-07-03 | ASSIGNED TO LIE |
2012-07-05 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2012-07-05 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2012-07-05 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2012-07-09 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
2012-07-25 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
2012-08-14 | PUBLISHED FOR OPPOSITION |
2012-08-14 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
2012-10-09 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
2013-04-04 | TEAS PETITION TO AMEND BASIS RECEIVED |
2013-04-04 | TEAS EXTENSION RECEIVED |
2013-04-04 | EXTENSION 1 FILED |
2013-04-04 | EXTENSION 1 GRANTED |
2013-04-06 | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED |
2013-04-15 | ASSIGNED TO PETITION STAFF |
2013-04-17 | 44(e) PETITION - GRANTED |
2013-04-17 | ATTORNEY REVIEW/DECISION ON AMENDMENT REQUIRED |
2013-05-02 | 44(e) PETITION - RECEIVED |
2013-05-02 | ASSIGNED TO PETITION STAFF |
2013-05-15 | PETITION INQUIRY LETTER MAILED |
2013-06-03 | TEAS RESPONSE TO PETITION TO DIRECTOR INQUIRY |
2013-06-25 | FAX RECEIVED |
2013-06-25 | COMMUNICATION RECEIVED FROM PETITIONER |
2013-07-24 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
2013-07-01 | 44(e) PETITION - GRANTED |
2013-09-25 | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED |
2013-10-15 | PUBLISHED FOR OPPOSITION |
2013-10-15 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
2013-10-29 | TEAS EXPRESS ABANDONMENT RECEIVED |
2013-11-02 | ABANDONMENT - AFTER PUBLICATION |
2013-11-04 | ABANDONMENT NOTICE MAILED - AFTER PUBLICATION |