SHIDAI - Trademark Details
Status: 602 - Abandoned-Failure To Respond Or Late Response
Serial Number
79294334
Word Mark
SHIDAI
Status
602 - Abandoned-Failure To Respond Or Late Response
Status Date
2021-05-17
Filing Date
2020-05-25
Mark Drawing
5000 - Illustration: Drawing with word(s)/letter(s)/number(s) in Stylized form
Typeset
Law Office Assigned Location Code
M90
Employee Name
FARRELL, ANNE M
Statements
Goods and Services
Watering hose; flexible hoses, not of metal; hoses of textile material; canvas hose pipes; drain hose; vehicle heater hose; connecting hose for vehicle radiators
Pseudo Mark
SHI DAI
Classification Information
International Class
017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal.
US Class Codes
001, 005, 012, 013, 035, 050
Class Status Code
6 - Active
Class Status Date
2020-09-28
Primary Code
017
Correspondences
Name
QIANHUI IP ATTORNEYS
Address
Please log in with your Justia account to see this address.
International Registrations
International Registration Number
1551880
International Registration Date
2020-05-25
International Publication Date
2020-09-24
International Renewal Date
2030-05-25
Auto Protection Date
2022-03-24
International Status
001 - Request for extension of protection established
International Status Date
2020-09-24
Priority Claimed In
False
First Refusal In
True
Trademark Events
Event Date | Event Description |
2020-09-24 | SN ASSIGNED FOR SECT 66A APPL FROM IB |
2020-09-28 | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM |
2020-09-28 | ASSIGNED TO EXAMINER |
2020-10-02 | APPLICATION FILING RECEIPT MAILED |
2020-10-06 | NON-FINAL ACTION WRITTEN |
2020-10-07 | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW |
2020-10-28 | REFUSAL PROCESSED BY MPU |
2020-10-28 | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB |
2020-11-14 | REFUSAL PROCESSED BY IB |
2021-05-17 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE |
2021-05-17 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND |