LDHC - Trademark Details
Status: 602 - Abandoned-Failure To Respond Or Late Response
Image for trademark with serial number 79235195
Serial Number
79235195
Word Mark
LDHC
Status
602 - Abandoned-Failure To Respond Or Late Response
Status Date
2019-02-13
Filing Date
2017-11-02
Mark Drawing
5000 - Illustration: Drawing with word(s)/letter(s)/number(s) in Stylized form Typeset
Law Office Assigned Location Code
M70
Employee Name
DELANEY, ZHALEH SYBIL
Statements
Indication of Colors claimed
Color is not claimed as a feature of the mark.
Goods and Services
Waterproof packings; flexible tubes, not of metal; pipe gaskets/ joint packings for pipes; reinforcing materials, not of metal, for pipes; junctions for pipes, not of metal; sealant compounds for joints; clutch linings; plastic pipes/tubes/ducts/hoses; cylinder jointing; compressed air pipe fittings, not of metal
Classification Information
International Class
017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal.
US Class Codes
001, 005, 012, 013, 035, 050
Class Status Code
6 - Active
Class Status Date
2018-07-02
Primary Code
017
Correspondences
Name
Weixinda Internatio; Property Agency (Be
Address
Please log in with your Justia account to see this address.
International Registrations
International Registration Number
1409464
International Registration Date
2017-11-02
International Publication Date
2018-06-28
International Renewal Date
2027-11-02
Auto Protection Date
2019-12-28
International Status
001 - Request for extension of protection established
International Status Date
2018-06-28
Priority Claimed In
False
First Refusal In
True
Trademark Events
Event DateEvent Description
2018-06-28SN ASSIGNED FOR SECT 66A APPL FROM IB
2018-07-02NEW APPLICATION OFFICE SUPPLIED DATA ENTERED IN TRAM
2018-07-02ASSIGNED TO EXAMINER
2018-07-03NON-FINAL ACTION WRITTEN
2018-07-04NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
2018-07-06APPLICATION FILING RECEIPT MAILED
2018-07-16REFUSAL PROCESSED BY MPU
2018-07-16NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
2018-08-04REFUSAL PROCESSED BY IB
2019-02-13ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE
2019-02-14ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND
2019-12-04NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
2019-12-04NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
2019-12-20NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
2020-02-13FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
2020-02-13FINAL DISPOSITION NOTICE SENT TO IB
2020-02-28FINAL DECISION TRANSACTION PROCESSED BY IB