C21 - Trademark Details
Status: 710 - Cancelled - Section 8
Serial Number
77020164
Registration Number
4133486
Word Mark
C21
Status
710 - Cancelled - Section 8
Status Date
2018-12-07
Filing Date
2006-10-12
Registration Number
4133486
Registration Date
2012-05-01
Mark Drawing
4000 - Standard character mark
Typeset
Published for Opposition Date
2011-09-27
Attorney Name
Law Office Assigned Location Code
L30
Employee Name
RICHARDS, SUSAN ANN
Statements
Goods and Services
Metallic building materials, namely, metallic fascia, metallic roof tiles, metallic roof sheets, metallic pipes and fittings; metallic roof tiles incorporating solar cells; metallic conduits; metallic hoses, metallic pipes and fittings; water tanks of metal for household purposes
Goods and Services
Solar powered electrical and electronic apparatus, namely, solar powered electricity generators; wind turbines; wind-powered electricity generators
Goods and Services
Apparatus for the supply, regulation, transmission, control, storage and distribution of electricity, namely, electricity generating apparatus utilizing renewable energy resources, namely, solar cells, photovoltaic cells; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; apparatus for converting electronic radiation to electrical energy, namely, solar energy operating apparatus modules; meters, namely, renewable energy meters; solar energy meters, namely, electricity meters and water meters; energy level indicators, namely, renewable energy indicators; solar energy indicators; electricity indicators; water indicators; water level indicators; water flow indicators; water temperature indicators and water pressure indicators; indicators for indicating electricity generated; indicators for indicating electricity demanded; indicators for indicating hot water generated; indicators for indicating hot water demanded; water pressure gauges; electrical components, namely, electrical transformers, electricity connectors, electricity cables, wires and leads, batteries, battery chargers, electric switches, electric power controllers, charge regulators; diodes, electrical plugs and sockets, inverters, thermostats, automatic time switches, computer chips, integrated circuits; solar powered communications and telecommunications apparatus, namely, solar powered telephones, solar powered radios, solar powered personal organizers, computer chips, blank smart cards, integrated circuits; solar powered wires for electric fences; cathodic protection apparatus for corrosion protection, water heating controls, namely, water temperature controls; water flow controls, namely, water pressure controls and water level controls; apparatus for converting electronic radiation to electrical energy, namely, solar panel arrays; photovoltaic solar panels for generating electricity
Goods and Services
Metallic articles for use as plumbing fittings, namely, metallic valves, metallic spouts, metallic adaptors, metallic drains; solar collectors; solar energy collectors; solar light fixtures, namely, indoor and outdoor solar powered lighting units and fixtures; solar heat exchangers; flashlights; solar powered lamps; electric light bulbs; water heaters, namely, water heaters utilizing renewable energy and water heaters utilizing solar energy; plumbing fittings, namely, adaptors, taps, stop cocks; valves, namely, water control valves; water filtering apparatus for domestic, commercial or industrial use; plumbing fittings, namely, metallic faucets, metallic baffles, metallic stop cocks; non-metallic articles for use as plumbing fittings, namely, non-metallic valves, non-metallic spouts, non-metallic adaptors, non-metallic drains; solar heat collection panels for collecting heat for heating hot water; and portable solar panels for collecting heat for heating hot water
Goods and Services
Pipes, namely, non-metal flexible pipes; tubes and hoses made of rubber, plastic or silicone for plumbing use; sealing plugs made primarily from silicone or rubber
Goods and Services
Non-metallic building materials, namely, non-metallic fascia, non-metallic roof tiles, non-metallic membrane roofing, non-metallic roof tiles incorporating solar cells; non-metallic roofing slates
Goods and Services
Buildings of solar operating plants; buildings of electricity generation, supply, regulation, transmission, control, storage and distribution plants; consultancy, advisory and information services relating to the construction of renewable energy and electricity generation facilities
Goods and Services
Electricity generating; production of renewable energy; production of solar energy; customized construction of renewable energy powered electricity generation, supply, regulation, transmission, control, storage and distribution apparatus; customized construction of renewable energy powered lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary apparatus; customized construction of solar energy generating apparatus; customized construction of solar roofs and solar panels; consultancy, advisory and information services relating to the construction of renewable energy and electricity generation apparatus
Pseudo Mark
C 21; CENTURY 21
Classification Information
International Class
006 - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores. - Common metals and their alloys; metal building materials; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery, small items of metal hardware; pipes and tubes of metal; safes; goods of common metal not included in other classes; ores.
US Class Codes
002, 012, 013, 014, 023, 025, 050
Class Status Code
2 - Sec. 8 - Entire Registration
Class Status Date
2018-12-07
Primary Code
006
International Class
007 - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements (other than hand-operated); incubators for eggs. - Machines and machine tools; motors and engines (except for land vehicles); machine coupling and transmission components (except for land vehicles); agricultural implements (other than hand-operated); incubators for eggs.
US Class Codes
013, 019, 021, 023, 031, 034, 035
Class Status Code
2 - Sec. 8 - Entire Registration
Class Status Date
2018-12-07
Primary Code
007
International Class
009 - Scientific, nautical, surveying, electric, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin-operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire-extinguishing apparatus. - Scientific, nautical, surveying, electric, photographic, cinematographic, optical, weighing, measuring, signalling, checking (supervision), life-saving and teaching apparatus and instruments; apparatus for recording, transmission or reproduction of sound or images; magnetic data carriers, recording discs; automatic vending machines and mechanisms for coin-operated apparatus; cash registers, calculating machines, data processing equipment and computers; fire-extinguishing apparatus.
US Class Codes
021, 023, 026, 036, 038
Class Status Code
2 - Sec. 8 - Entire Registration
Class Status Date
2018-12-07
Primary Code
009
International Class
037 - Building construction; repair; installation services. - Building construction; repair; installation services.
US Class Codes
100, 103, 106
Class Status Code
2 - Sec. 8 - Entire Registration
Class Status Date
2018-12-07
Primary Code
037
International Class
011 - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes. - Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and sanitary purposes.
US Class Codes
013, 021, 023, 031, 034
Class Status Code
2 - Sec. 8 - Entire Registration
Class Status Date
2018-12-07
Primary Code
011
International Class
017 - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal. - Rubber, gutta-percha, gum, asbestos, mica and goods made from these materials and not included in other classes; plastics in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, not of metal.
US Class Codes
001, 005, 012, 013, 035, 050
Class Status Code
2 - Sec. 8 - Entire Registration
Class Status Date
2018-12-07
Primary Code
017
International Class
019 - Building materials (non-metallic); non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal. - Building materials (non-metallic); non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal.
US Class Codes
001, 012, 033, 050
Class Status Code
2 - Sec. 8 - Entire Registration
Class Status Date
2018-12-07
Primary Code
019
International Class
040 - Treatment of materials. - Treatment of materials.
US Class Codes
100, 103, 106
Class Status Code
2 - Sec. 8 - Entire Registration
Class Status Date
2018-12-07
Primary Code
040
Correspondences
Name
Mark H. Tidman
Address
Please log in with your Justia account to see this address.
Foreign Application Information
Filing Date | Application Number | Country | Foreign Priority Claim In |
2006-04-13 | 2419360 | United Kingdom | True |
Trademark Events
Event Date | Event Description |
2006-10-17 | NEW APPLICATION ENTERED IN TRAM |
2006-10-18 | NOTICE OF PSEUDO MARK MAILED |
2007-01-31 | ASSIGNED TO EXAMINER |
2007-03-01 | NON-FINAL ACTION WRITTEN |
2007-03-02 | NON-FINAL ACTION MAILED |
2007-08-29 | PAPER RECEIVED |
2007-10-11 | ASSIGNED TO LIE |
2007-10-11 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2007-10-11 | AMENDMENT FROM APPLICANT ENTERED |
2007-11-06 | SUSPENSION LETTER WRITTEN |
2007-11-07 | LETTER OF SUSPENSION MAILED |
2008-03-04 | ASSIGNED TO EXAMINER |
2008-03-04 | PAPER RECEIVED |
2008-03-07 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2008-03-07 | AMENDMENT FROM APPLICANT ENTERED |
2008-05-14 | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED |
2008-05-14 | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED |
2008-05-23 | NON-FINAL ACTION WRITTEN |
2008-05-23 | NON-FINAL ACTION MAILED |
2008-11-24 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
2008-11-25 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2008-11-25 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2008-12-15 | EXAMINERS AMENDMENT -WRITTEN |
2008-12-15 | EXAMINERS AMENDMENT E-MAILED |
2008-12-15 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
2008-12-15 | EXAMINER'S AMENDMENT ENTERED |
2008-12-18 | EXAMINER'S AMENDMENT ENTERED |
2008-12-20 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2008-12-23 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
2009-01-13 | SUSPENSION LETTER WRITTEN |
2009-01-13 | LETTER OF SUSPENSION E-MAILED |
2009-01-13 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED |
2009-05-20 | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED |
2009-05-20 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2009-05-20 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2009-06-07 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2009-06-07 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2009-06-19 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2009-06-22 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
2009-07-04 | WITHDRAWN FROM PUB - OG REVIEW QUERY |
2009-07-23 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
2009-07-29 | NON-FINAL ACTION WRITTEN |
2009-07-29 | NON-FINAL ACTION E-MAILED |
2009-07-29 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
2009-10-27 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
2009-10-27 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2009-10-27 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2009-11-21 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2009-11-23 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
2009-12-07 | WITHDRAWN FROM PUB - OG REVIEW QUERY |
2009-12-14 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
2010-01-27 | NON-FINAL ACTION WRITTEN |
2010-01-27 | NON-FINAL ACTION E-MAILED |
2010-01-27 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
2010-02-24 | EXAMINERS AMENDMENT -WRITTEN |
2010-02-24 | EXAMINERS AMENDMENT E-MAILED |
2010-02-24 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
2010-02-24 | EXAMINER'S AMENDMENT ENTERED |
2010-02-26 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2010-03-01 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
2010-03-12 | WITHDRAWN FROM PUB - OG REVIEW QUERY |
2010-04-01 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
2010-05-13 | EXAMINERS AMENDMENT -WRITTEN |
2010-05-13 | EXAMINERS AMENDMENT E-MAILED |
2010-05-13 | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED |
2010-05-13 | EXAMINER'S AMENDMENT ENTERED |
2010-06-02 | PRIORITY ACTION WRITTEN |
2010-06-02 | PRIORITY ACTION E-MAILED |
2010-06-02 | NOTIFICATION OF PRIORITY ACTION E-MAILED |
2010-09-09 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
2010-09-10 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2010-09-10 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2010-09-09 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2010-09-10 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2010-10-22 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2010-10-22 | PREVIOUS ALLOWANCE COUNT WITHDRAWN |
2010-11-23 | NON-FINAL ACTION WRITTEN |
2010-11-23 | NON-FINAL ACTION E-MAILED |
2010-11-23 | NOTIFICATION OF NON-FINAL ACTION E-MAILED |
2010-12-21 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
2010-12-21 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2010-12-21 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2011-02-04 | PRIORITY ACTION WRITTEN |
2011-02-04 | PRIORITY ACTION E-MAILED |
2011-02-04 | NOTIFICATION OF PRIORITY ACTION E-MAILED |
2011-07-26 | TEAS RESPONSE TO OFFICE ACTION RECEIVED |
2011-07-26 | CORRESPONDENCE RECEIVED IN LAW OFFICE |
2011-07-27 | TEAS/EMAIL CORRESPONDENCE ENTERED |
2011-08-19 | APPROVED FOR PUB - PRINCIPAL REGISTER |
2011-08-20 | LAW OFFICE PUBLICATION REVIEW COMPLETED |
2011-09-27 | PUBLISHED FOR OPPOSITION |
2011-09-27 | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED |
2011-11-22 | NOA E-MAILED - SOU REQUIRED FROM APPLICANT |
2012-03-21 | TEAS DELETE 1(B) BASIS RECEIVED |
2012-03-22 | CASE ASSIGNED TO INTENT TO USE PARALEGAL |
2012-03-21 | NOTICE OF ALLOWANCE CANCELLED |
2012-03-22 | 1(B) BASIS DELETED; PROCEED TO REGISTRATION |
2012-05-01 | REGISTERED-PRINCIPAL REGISTER |
2017-05-01 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED |
2018-12-07 | CANCELLED SEC. 8 (6-YR) |